Description

Anodizing machine is waiting for you.

In briefly, chrome plating machine is divided into 5 big steps:pre-treatment, copper plating, Nickel plating, Chrome plating andpost-treatment.

Pre-treatment: Includessoak cleaning, electro-cleaning, acid activation, etc.

Plating: Once the surface is properly activated, chromium is depositedthrough electroplating.
Post-treatment: Rinsing, neutralizing, drying, and inspection.

Machine Construction:

1. Frame:Made of Q235 100x100x4.0t square tube, with anti-corrosion primer plus outerpowder coating to enhance durability and corrosion resistance.

2. Tanks:PP material ( 15mm / 20mm/ 25mm thick) with reinforced rib structure for extrachemical resistance and mechanical strength.

3. Transport System:Equipped with 6SET PLC-controlled overhead transporters for precise automatichandling and improved productivity.

4. Air Agitation / Solution Circulation System:Ensures uniform electrolyte flow distribution in plating tanks for stableplating thickness and quality.

5. Heating System:Steam or electric heating options are available depending on customerrequirement, providing efficient temperature control and energy-savingperformance.

6. Rinsing System:Multi-stage spray and immersion rinsing combination. Spray rinsing can beautomatically activated by workpiece lifting action via solenoid valves,reducing water consumption while improving rinsing quality.

No items found.

Specifications

Chrome plating machine process includes Loading → Soak cleaning → Spray rinse → Electro-cleaning → Spray rinse → Acidactivation → Rinse1/2 → Copper plating → Rinse1/2 → Nickel plating → Rinse1/2 → Chrome plating → Rinse1/2 → Neutralizing → Rinse → Hot air drying → Unloading

Dimension L80,000xW1,500xH2100MM

Tanks dimension L4200xW1000xH1500 mm

Chrome heating/cooling Steam heating with cooling coil

Chrome process time Copper 10-25min; Nickel 20-40min; Chrome 1-5min

Total power consumption 350KW

Guarantee 1year

Optional Filter, Rectifier, Auto regeneration system; Cooling chiller; waste gas scrubber(acid fume treatment)

Size chart
How long is machine guarantee time?

All non-consumableparts are covered by a one-year warranty. Any defect under normal operationwill be replaced free of charge, excluding damage caused by misuse or naturaldisasters.

Why choose us?

1). With more than25 years of experience serving multiple industries, we can design equipmentthat best meets your needs.
2). Allmanufacturing processes are carried out in our own factory, ensuring bettercost control and more competitive equipment prices.
3). We aim forlong-term cooperation and focus on providing reliable, high-quality machines toensure excellent performance in your actual production.

Do youprovide installation service?

Definitely. Wehave a professional overseas installation team, typically consisting of onetranslator, two mechanical engineers, and one electrical engineer. Toaccelerate the overall installation and commissioning process, local laborsupport from your side is required.

Where are you located? How to visit us?

Warmly welcome tovisit us
Our address: No.123, Hanjiang West Road, Xuejia Town, Changzhou, Jiangsu, China.
If you arearriving from Shanghai, please take the high-speed train from Shanghai HongqiaoStation to Changzhou North Station — the journey takes about one hour. We willarrange to pick you up upon arrival.If you are comingfrom another city in China (such as Shenzhen or Guangzhou), you may take adirect flight to Changzhou Benniu International Airport.
Before your visit,please kindly contact me in advance so I can suggest the most convenient traveloption.
For any inquiries,feel free to reach me directly via WeChat/WhatsApp or email (as shown in thevideo).

RELATED